Company Overview
- Formed by Tom Callaghan and Lee Comer at a small office in Ringwood, Hampshire.
- Our first purchase of panels saw our Technical Director, Lee Comer and his Dad Tony, driving to Germany to pick up 38 Square Metres from Ritter Solar at which point they successfully secured their first contract for 2003-2005 inclusive.
- Since this the Company has gone from strength to strength smashing all targets set. Requiring them to move premises on two occasions. In 2004 we moved to a new Unit in Dorset. 2005 saw a move to their current location at a large cost to the Company.
- We at Simplee Solar Ltd have formed a good Partnership with Ritter and are proud to install their products.
- We fit the following panels
- OEM CPC 6
- OEM CPC 12
- OEM CPC 18
- Trade Panels 12 tube
Please CLICK HERE to download our brochure for technical information on Ritter Panels.
TRAINING ROOM AND LIVE SYSTEM
![]() |
![]() |
We have set up a live system for instructional purposes which we can demonstrate to local schools and councils, along with members of the public and new installers.
About Us
These last few years have seen an abundance of changes within both the business and the solar industry. We at Simplee Solar Ltd have kept up with the massive growth in the industry with huge internal investment. |
![]() |
![]() |
Head office in Wimborne has expanded from our present unit to the adjoining unit giving some 22,000 square feet of office and warehouse space, this now includes a purpose built training school (see above) for all of our solar installers. All new and existing installers have to attend regular training courses designed to equip them with specialist knowledge of our solar products and refresh them on our installation procedures. We believe we are the first UK solar company to have a dedicated in-house training school. |
Simplee Solar Ltd have a strong policy on quality control. To maintain the high quality of our installations we require our engineers to photograph their work which is then quality checked by our Field Manager. The Field Manager is also required to do spot inspections on our installations to ensure our work is kept to a high standard.
Our Warehouse
All Warehouse Staff are fully trained in all aspects of Health & Safety, First Aid, Manual Handling & hold a current Fork Lift License.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Wimborne office is the base for all nationwide operations handling every last detail of your order. The equipment is specified on the technical survey of each individual order and is ordered from the warehouse. Cylinders are delivered and are quality checked before dispatched with one of our courier services. We also pick, assemble and pack other items required for the installation.
Where possible, we use our in house courier team to ensure a quality service.
Installation Department
We control all aspects of the installation process from Wimborne. The installations are booked once we have ordered the equipment required and deliveries coordinated. We have a bespoke database to assist with the tracking and progress. The dedicated service department assist with all technical enquiries from customers with our installations and deal with any system emergencies when required. We have a team of field service engineers based nationally to cover all of our customers needs. |
![]() |
Survey and Planning office
If the technical survey suggests that planning permission is required, our in house planning department will arrange everything for us.
This includes contact with the appropriate channels and completion of the necessary paperwork.
Doing our bit!
![]() |
![]() |
All our cardboard is recycled using our on site compacter. All other office waste is recycled, All unnecessary use of energy is conserved to comply with our:
MISSION STATEMENT
As a Company our commitment is to achieve where possible 100% results towards our customers and our staff.
As a rapidly growing business we look forward to a bright future and a big impact on the UK’s Carbon Footprint.
















